How is an access control system installed? What key considerations should you keep in mind? A Shanghai-based smart access control provider walks you through it.
Classification: Latest Updates
Release time:2022-10-20 11:27
How is an access control system installed? What key considerations should be kept in mind? Shanghai smart access control service provider Let me walk you through it.
1. After the system is installed, first connect all access‑control card readers to the host unit, then individually inspect the warehouse’s card readers for any omissions or false alarms. Once one circuit has been checked, proceed to the next. In this way, verify each circuit separately; only after confirming that everything is functioning correctly should you connect all circuits together.
2. Administrators can grant access permissions based on user roles. Certain individuals may enter and exit any area at any time, while ordinary users are restricted to authorized areas during designated hours with their access cards. When all access points are either properly activated or illegally opened, the control computer will log the event.

3. If the computer is unable to connect to the controller due to a malfunction or other reasons, can the controller still record relevant information about the controlled gate? Once the computer reconnects, can it automatically upload all recorded data, and can it ensure the integrity of the information?
4. Maintain thorough commissioning records.
5. Complete the report.
A Shanghai-based smart access control service provider advises that the following points should be considered when installing an access control system:
1. Wiring for installation works shall comply with the national “Code for Construction and Acceptance of Electrical Installation Projects” as well as other relevant national codes and regulations. Conduit or cable tray wiring shall be carried out after plastering and flooring works have been completed.
Before threading wires, any standing water and debris in the conduit or raceway shall be removed. Conductors belonging to different systems, different voltage levels, or different current categories shall not be routed within the same conduit or the same compartment of a multi-compartment raceway. No splices or kinks shall be permitted in conduits or raceways.
A Shanghai-based smart access‑control service provider states that wire splices should be soldered within junction boxes or connected using terminals. For low‑cross‑section systems, splicing is permissible; the splice should comprise at least five turns, after which it must be tinned and wrapped with insulating tape. When conduits pass through building expansion joints, compensating measures shall be implemented. On either side of the expansion joint, appropriate slack should be left in the conductors for secure fixing. The terminals inside junction boxes must be crimped or mounted on terminal blocks with soldered connections, and each terminal should be clearly labeled.
2. The access control controller shall be securely mounted, with no tilting, and shall bear clear identification. When installed on lightweight partition walls, reinforcement measures must be implemented. Cables or wires leading to the access control controller shall be neatly routed, avoiding crossings; the cores of cable conductors and the corresponding wire terminations shall be clearly numbered and resistant to fading when exposed to drawings. Each terminal block and each terminal shall accommodate no more than two connections. Cables and wires shall have a minimum excess length of 20 cm. Wiring shall be bundled. After the incoming cables are threaded through the conduit, the openings must be sealed at the point where the conduit enters the wall.
3. The main power supply cable of the access control controller shall be connected directly to the power source. Power plugs are prohibited, and the main power supply must be clearly labeled. The controller’s grounding shall be secure and clearly marked.
4. The routing and specifications of the grounding busbar in the monitoring room shall comply with the design requirements.
Shanghai smart access control service provider It is stated that during installation, the following requirements shall be met: the surface of the grounding busbar shall be intact, free from obvious damage and residual solder flux; copper‑strip busbars shall be smooth and free of burrs, and their insulation layers shall show no signs of aging or cracking. The grounding busbar shall be routed within floor trenches or cable trays and secured to the outer side of the rack channels. The busbar run shall be straight, with no skewing or bending, and its connections to the busbar or to the top of the equipment shall be firm. Copper‑strip busbars in cable trays may be fastened with screws, while copper‑strand busbars in cable trays shall be tied to cross members. Lightning‑protection grounding installations for system projects shall be carried out strictly in accordance with the design specifications, and grounding work shall be coordinated with civil‑construction activities.