Equipment Management in Pharmaceutical Enterprises under the GMP System
Classification: Q&A
Release time:2023-02-06 09:35
Previous article Laboratory Management in Pharmaceutical Enterprises under the GMP System In the previous installment, we introduced the laboratory management module, one of the six major systems in GMP inspection. This article will focus on the equipment management module. Equipment management encompasses all activities across every stage of an asset’s lifecycle. Drawing on the key processes associated with each phase, this discussion will cover equipment asset management, pre‑purchase planning, operational and maintenance management, lubrication and troubleshooting, as well as post‑use management.
Equipment Asset Management:
Equipment asset management is an economic tool for enterprise management, enabling the rational allocation of limited funds. Its main components include:
(1) Establish an equipment asset ledger and conduct registration, inventory, and reconciliation. The asset records shall promptly and accurately reflect the current status of equipment, as well as its transfer-in, transfer-out, write-off, and disposal statuses, ensuring that no non‑conforming equipment is present on the production floor.
(2) Supervise the maintenance and repair of equipment assets. To ensure that equipment remains in good working condition, it is necessary to monitor and verify compliance with equipment maintenance procedures and secure adequate funding for maintenance planning.
(3) Supervise and evaluate the utilization efficiency of fixed assets.
(4) Disposing of idle and underutilized production equipment can reduce the amount of fixed capital tied up by the enterprise, thereby lowering expenses and ensuring the efficient use of funds.
Equipment Pre-Management:
Early-stage equipment management encompasses research and feasibility studies, procurement, design or equipment selection, manufacturing or construction, installation and commissioning, and commissioning for operation. URS (User Requirements Specification) and equipment qualification and acceptance are the core components of early-stage equipment management. The GMP‑related commissioning and qualification phases that a typical pharmaceutical manufacturing device undergoes, from the URS through to final PQ completion and handover to the user, are illustrated in the figure below:

01 URS (User Requirements Specification)
The URS (User Requirements Specification) is the set of requirements that the user specifies for equipment, facilities, and hardware systems. It serves as the fundamental basis for equipment selection and design; therefore, it must provide detailed descriptions of production capacity, manufacturing processes, operational needs, cleaning requirements, reliability expectations, contamination‑control measures, error‑proofing requirements, regulatory compliance, and data integrity standards.
02 Equipment Verification and Acceptance
Equipment verification and acceptance include Factory acceptance testing, on-site testing, the four‑stage validation process (Design Qualification—DQ, Installation Qualification—IQ, Operational Qualification—OQ, and Performance Qualification—PQ), and ongoing validation status maintenance for pharmaceutical equipment. , to ensure that pharmaceutical manufacturing equipment meets the requirements of drug production. Validation is the documented confirmation that the systems subject to validation achieve their intended performance and operational consistency, encompassing all processes that impact product quality.
The equipment management department must effectively manage acceptance and validation activities. First, it should clearly define the regulatory requirements for validation and identify which GMP‑related documents are mandated by law. Second, it should clarify the relationship between and the distinctions among non‑GMP documents and validation activities. User Requirement Specifications (URS), pre‑operational test documents (FAT, SAT), and similar materials play a critical supporting role in equipment qualification and validation.
Design Qualification (DQ) is the process of verifying, during the design phase, that the design complies with GMP requirements and intended use; it is typically performed for custom‑designed systems. DQ should encompass user requirement specifications, design criteria, supplier evaluations, and other relevant elements.
Installation Qualification (IQ) is an assessment of the overall installation status and, in accordance with GMP requirements, a review of calibration, maintenance, validation, and documentation.
Operational Qualification (OQ) is a dynamic validation activity that demonstrates the equipment’s ability to consistently and continuously meet the user‑defined functional specifications. Performance Qualification (PQ) involves documenting, under specified operating conditions, that the process can consistently and continuously achieve the predetermined performance criteria.
Maintaining the validation status is critical to ensuring that equipment, processes, or systems remain consistently “validated” and “controlled,” as required by GMP. This includes change control, retrospective validation, and revalidation. The equipment management department should not only conduct periodic retrospective validations of pharmaceutical manufacturing equipment but also perform revalidation whenever such equipment is upgraded, re‑commissioned, undergoes major repairs, or is subject to significant technological modifications. During the validation process, efforts should be strengthened to ensure the rationality and comprehensiveness of validation protocols and content, thereby enhancing the accuracy of validation activities.
03 Equipment Status Flag Management
Production equipment shall be equipped with complete and clearly visible status indicators, specifying the equipment’s performance status, operational status, cleanliness status, and process status.
The following precautions apply:
(1) All equipment in use shall be assigned a unique identification number, which must be clearly marked on the equipment itself. Each piece of equipment shall be entrusted to a designated custodian, with clear assignment of responsibility.
(2) Each piece of equipment shall be equipped with a status tag; for example, a green tag indicates that the equipment is in good working condition.
(3) In addition to being painted in accordance with the prescribed colors, all piping and pipeline systems shall be clearly labeled with the conveyed medium and flow direction arrows.
(4) Sterile equipment shall be labeled with the sterilization date and the date of use; if the expiration date has passed, it must be re-sterilized before use.
(5) When the equipment status changes, promptly replace the identification tag to prevent operational errors.
Equipment Usage and Maintenance Management:
Equipment operation and maintenance management encompasses equipment use, cleaning, inspection, servicing, and repair. This process ensures proper operation and safe functioning of the equipment, facilitates appropriate technical maintenance, maximizes its technical performance, extends its service life, and optimizes its economic efficiency.
01 Equipment Operation and Use
Equipment operation management refers to the maintenance, inspection, calibration, monitoring of operating conditions, and management of related records during the equipment’s service life.
Mainly divided into:
Routine Management: To prevent contamination and cross‑contamination of pharmaceutical products and to ensure the proper operation of production equipment, users of such equipment must also perform routine cleaning and maintenance.
Monitoring and management of equipment operating status: During normal operation, equipment parameters must remain within specified limits; deviations from these limits may pose risks to product quality.
02 Equipment Cleaning
The specific contents of the cleaning procedure include:
• Division of responsibilities and duties for equipment cleaning
• Cleaning methods and procedures
• Cleaning cycle: When the same equipment is used consecutively to process the same sterile product, it must be cleaned and sterilized between batches. When the same equipment is used to process the same non-sterile product, a thorough cleaning must be performed at least weekly or after every three production batches.
• Name, ingredients, concentration, and preparation method of the cleaning agent
• Cleaning validation methods for critical equipment
• Relevant data from the cleaning process and post‑cleaning inspections shall be recorded and archived.
• The cleaning of aseptic equipment, particularly those parts and components that come into direct contact with the drug product, must be followed by sterilization, with the sterilization date clearly marked; microbiological validation should be performed when necessary.
03 Equipment Maintenance Management
Equipment maintenance management encompasses daily maintenance, periodic maintenance, and preventive maintenance.
(1) Daily Equipment Maintenance: Equipment and production management personnel shall require operators to follow the equipment maintenance SOP and conduct thorough inspections.
Main Contents of the Maintenance and Servicing Procedures :
• Implement a dedicated responsibility system for each position, ensuring that every piece of equipment, instrument, and other asset is maintained and serviced by a designated person.
• Before starting the equipment, carefully verify that all fastening bolts are present and securely tightened, and that all safety devices are intact.
• During equipment operation, observe carefully, maintain thorough records, and address any abnormalities promptly.
• After the equipment is shut down, complete all necessary tasks, including cleaning and sweeping.
• Conduct regular inspections, perform meticulous maintenance, carry out frequent checks, promptly address malfunctions, and ensure the equipment remains in good working condition.
• Strictly adhere to operating parameters; absolutely prohibit operation beyond temperature, pressure, speed, or load limits.
• Ensure proper corrosion protection, freeze prevention, thermal insulation (for cold environments), and leak sealing of equipment.
• Maintain good hygiene of the environment and equipment.
• Equipment lubrication shall be carried out in strict accordance with the “Equipment Lubrication Management Regulations,” with particular emphasis on regularly cleaning the lubrication system and associated tools.
(2) Scheduled Equipment Maintenance: The equipment management department issues maintenance tasks in the form of a plan, and operating and maintenance personnel carry out routine maintenance in accordance with the equipment maintenance and servicing SOP. For major and medium‑overhaul schedules, the equipment management department shall coordinate with the production planning department; based on equipment operating records and current condition, it shall formulate a well‑structured annual major and medium‑overhaul plan at the beginning of each year. Furthermore, in advance of the overhaul schedule, appropriate procurement and fabrication of spare parts must be arranged to ensure the smooth implementation of these maintenance programs.
(3) Preventive maintenance: This involves using specific technical methods to monitor the condition of various equipment components, identifying emerging fault trends in advance, and taking corrective actions before failures occur to eliminate potential risks. Currently, equipment maintenance in domestic pharmaceutical companies is predominantly reactive—maintenance is performed only after a failure has already taken place. The consequences can range from minor disruptions to drug production to more severe outcomes such as rework or scrapping of finished products, thereby seriously compromising product quality. To meet GMP requirements and keep pace with scientific and technological advances, replacing reactive maintenance with preventive maintenance has become an inevitable trend. In practical equipment management, setting maintenance objectives should begin by prioritizing condition monitoring for critical equipment, key components, and integrated production lines, implementing preventive maintenance, and gradually extending this approach to all equipment.
At present, the conventional equipment maintenance management model employed by traditional pharmaceutical companies can no longer adequately meet contemporary development demands and competitive market conditions. It is imperative to leverage information technology effectively and progressively establish a preventive maintenance system for equipment.
Equipment Lubrication Management and Fault Management:
1. Equipment lubrication management is an essential component of equipment management and also integral to production management. In daily operations, the equipment lubrication SOP must be strictly adhered to, ensuring compliance with the “Five Determinations” (designated location, specified grade, prescribed quantity, assigned personnel, and scheduled timing) and the “Three‑Stage Filtration” system. With regard to the selection of lubricating oils and greases, equipment and production managers should, in accordance with the equipment’s technical documentation and the specific lubrication points, choose appropriate lubricants that meet relevant standards.
2. Equipment failures can be classified into two categories: design-related failures and operational failures.
Design‑related failures are constrained by the equipment manufacturer’s expertise, manufacturing quality, and technological level; they arise from inherent defects in the equipment caused by inadequacies in design, material selection, fabrication, or assembly, and thus stem from the equipment’s early‑stage management. In contrast, operational failures result from factors such as installation and commissioning, routine operation, daily maintenance, preventive and corrective servicing, and natural wear and tear, and are attributable to the equipment’s operational management.
Equipment management personnel should categorize this type of fault—for example, by the location of the failure, its root cause, the alarm display method, its nature, the actuator involved, and any sources of interference. Based on these classifications, they can identify the underlying cause, assign the appropriate maintenance team, enhance repair efficiency, and minimize financial losses to the enterprise.
Post-implementation management of equipment:
The conditions for scrapping equipment shall be clearly defined. Equipment that must be dismantled due to factory renovations or process changes, or that is severely damaged beyond repair or poses a significant risk to personnel if continued in service, may be scrapped. Scrapping must be documented through a formal plan, records, and a report to establish a closed-loop management of the equipment’s lifecycle. Approval must follow the established procedures, and upon authorization of write‑off, the following steps shall be taken: terminate the preventive maintenance schedule, the instrument calibration schedule, and the spare parts procurement plan; and archive all relevant system information. For automated equipment and instruments, ensuring the long-term readability of the data they generate during the retention period is another critical consideration after system decommissioning.
Summary
Equipment management plays a critical role in the pharmaceutical manufacturing process. To ensure that both the production process and product quality comply with GMP requirements, equipment management must maintain proper equipment operation, extend equipment service life, minimize product contamination, safeguard drug quality and safety, and enhance both corporate economic performance and compliance in equipment management.